Banner

Case Studies

Case Study: Custom Tank Battery Installation for Select Energy Services Download PDF

Titan Tanks & Vessels completed a custom tank battery installation for Select Energy Services. The site location, in Bethany, Texas, consisted of an old brine water battery containing rusted tanks and pipes which needed to be replaced. Although the timeframe for this job was very short – 10 days total – Titan was able to handle the turnkey installation on time and on budget.

Read more...

 

Case Study - Turn Key Installation

Titan Tanks and Vessels was awarded a turn-key contract by Rising Star Energy, LLC., to provide storage tanks, separators and all the required installation and hook up. Allied Technology is unique among our competitors in our ability to provide both equipment and installation through our roustabout division as a single source so that delays are minimized and production is initiated as soon as possible.

Read more...

 

Case Study - Double Pad/Well

Part of Allied Technology’s strategy is to offer turn-key systems that include products, packaging, site preparation and hook up. Our goal is to ensure the safest, quickest and most cost-effective solution to allow customers to begin rapid production at the well site.

Read more...